Upcoming Features

What's new at the CECC?

Here are some new features to look forward to when the 52,000 square foot expansion project is complete:

  • a 3-lane pool with multi-level teaching area;
  • a brand-new full-service library with maker space;
  • a fitness centre and studio;
  • a large gymnasium with updated court lines for all the sports – including pickleball, and a large bright walking track overlooking the gym;
  • a café that will help fuel both active and casual visitors alike or provide a boost to those cheering from the sidelines;
  • an outdoor rink and pavilion behind the CECC (Coming in winter 2024)
  • outdoor water filling stations for people and pets near the soccer fields;
  • more pedestrian-friendly access throughout the complex linking visitors to outdoor facilities, paths and Caledon Town Hall.
Share Upcoming Features on Facebook Share Upcoming Features on X (formerly Twitter) Share Upcoming Features on Linkedin Email Upcoming Features link
<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>