Bolton Secondary Plans Review

Share Bolton Secondary Plans Review on Facebook Share Bolton Secondary Plans Review on Twitter Share Bolton Secondary Plans Review on Linkedin Email Bolton Secondary Plans Review link

Vision and Planning Alternatives Report

The Vision and Planning Alternatives Report finalizes the vision and guiding principles for the Bolton Secondary Plan and introduces two Planning Alternatives for the Focused Study Area. The Report introduces the baseline assumptions/common elements for the two Planning Alternatives and describes in detail the components of each. The Report also presents a set of evaluation criteria and measures for evaluating the two Planning Alternatives and summarize the results from our engagement to date.

Staff will use the Vision and Planning Alternatives Report as the basis for the development of a Preferred Planning Alternative for the Bolton Secondary Plans Review, subject to further refinement based on public input throughout the public engagement process.

To read the Report, please review the following document:

Vision and Planning Alternatives Report

----------------------------------------------------------------------------------------------

Vision and Planning Alternatives Public Information Session:

Public consultation is a vital component of the planning process.

A Public Information Session is being held to receive your comments regarding the proposed vision and planning alternatives report for the Bolton Secondary Plans Review.

At the Public Information Session, the Town of Caledon will present information related to the proposed vision and two planning alternatives for the Bolton area with particular focus along the Queen Street Corridor.

To read more about the project, please review the following documents:

Vision and Planning Alternatives Presentation


WHEN:

Thursday, February 22, 2024

Start Time: 6:30 p.m.

Presentation Time: 7:00 p.m.


WHERE:

Caledon Centre for Recreation and Wellness

4111 Hwy 50, Bolton, ON L7E 2V2

----------------------------------------------------------------------------------------------

The Bolton Secondary Plans Review has begun. This project will prepare a modern and innovate planning framework for built form and land use to guide intensification and land use change in this area to the 2051 planning horizon.

There are some primary goals for the project. By its completion, the Bolton Secondary Plans Review will:

  • Consolidate the six (6) existing Secondary Plans for Bolton into a single modern Secondary Plan for the existing Bolton community that can guide development in the area to the 2051 planning horizon, and integrate with new Secondary Plans for the expanded Bolton area;


  • Analyze the potential for a second Bolton area GO station on the Caledon-Vaughan GO rail line in the proximity of Queen Street/Highway 50, which could be designated as a Major Transit Station Area, and act as a catalyst for mixed use intensification in this area;


  • Complete a detailed planning study of the proposed Focused Study Area along the Queen Street corridor from the rail line to Mayfield Road, to put in place a modern and innovative planning policy framework (built form and land use) to guide intensification and land use change in this area to the 2051 planning horizon; and,


  • Address the interface and compatibility of mixed use/residential intensification adjacent to an existing dry industrial area and determine options for the future that consider the long-term viability of the dry industrial area.

To read more about the project, please review the following documents:

Vision and Planning Alternatives Report

The Vision and Planning Alternatives Report finalizes the vision and guiding principles for the Bolton Secondary Plan and introduces two Planning Alternatives for the Focused Study Area. The Report introduces the baseline assumptions/common elements for the two Planning Alternatives and describes in detail the components of each. The Report also presents a set of evaluation criteria and measures for evaluating the two Planning Alternatives and summarize the results from our engagement to date.

Staff will use the Vision and Planning Alternatives Report as the basis for the development of a Preferred Planning Alternative for the Bolton Secondary Plans Review, subject to further refinement based on public input throughout the public engagement process.

To read the Report, please review the following document:

Vision and Planning Alternatives Report

----------------------------------------------------------------------------------------------

Vision and Planning Alternatives Public Information Session:

Public consultation is a vital component of the planning process.

A Public Information Session is being held to receive your comments regarding the proposed vision and planning alternatives report for the Bolton Secondary Plans Review.

At the Public Information Session, the Town of Caledon will present information related to the proposed vision and two planning alternatives for the Bolton area with particular focus along the Queen Street Corridor.

To read more about the project, please review the following documents:

Vision and Planning Alternatives Presentation


WHEN:

Thursday, February 22, 2024

Start Time: 6:30 p.m.

Presentation Time: 7:00 p.m.


WHERE:

Caledon Centre for Recreation and Wellness

4111 Hwy 50, Bolton, ON L7E 2V2

----------------------------------------------------------------------------------------------

The Bolton Secondary Plans Review has begun. This project will prepare a modern and innovate planning framework for built form and land use to guide intensification and land use change in this area to the 2051 planning horizon.

There are some primary goals for the project. By its completion, the Bolton Secondary Plans Review will:

  • Consolidate the six (6) existing Secondary Plans for Bolton into a single modern Secondary Plan for the existing Bolton community that can guide development in the area to the 2051 planning horizon, and integrate with new Secondary Plans for the expanded Bolton area;


  • Analyze the potential for a second Bolton area GO station on the Caledon-Vaughan GO rail line in the proximity of Queen Street/Highway 50, which could be designated as a Major Transit Station Area, and act as a catalyst for mixed use intensification in this area;


  • Complete a detailed planning study of the proposed Focused Study Area along the Queen Street corridor from the rail line to Mayfield Road, to put in place a modern and innovative planning policy framework (built form and land use) to guide intensification and land use change in this area to the 2051 planning horizon; and,


  • Address the interface and compatibility of mixed use/residential intensification adjacent to an existing dry industrial area and determine options for the future that consider the long-term viability of the dry industrial area.

To read more about the project, please review the following documents:

Ask about the Bolton Secondary Plans Review

Lets Talk! Ask us any questions or concerns about the Bolton Secondary Plans Review. 

loader image
Didn't receive confirmation?
Seems like you are already registered, please provide the password. Forgot your password? Create a new one now.
Page last updated: 08 Jul 2024, 10:49 AM